M-100 Wind Turbine

Generator

Rated Power: 100 Kw at approximately 35 mph
Type: 3 phase, 60 Hz synchronous 480 VAC
RPM: 1200 (3 phase)

Monopole Tower

Construction material; Hot dipped galvanized steel plate
Height 75 ft
Hub height: 78 ft
White colored paint coating
Nacelle acess: interior tower ladder through locked door
Base Diameter: . 6’ 5”
Control Panel located inside bottom of tower

Rotor

Orientation: Upwind
3 blades, fixed pitch
71’6” diameter

Blades

Aerostar 10 meter
Fiberglass
Weight – approx. 1700 lbs.
Area swept: 4,020 sqf
Centrifugal blade –tip brakes

Component Weights

Nacelle, Bedplate, Rotor and blades: 15,700 lbs
Tower (3 sections): 16,800

Operational

Cut in speed: 11mph
Cut-off speed: None (stall regulated blades)
Survival wind speed: 120 mph

Other

New elecronic controls panel
New Wiring

Options

Internet accessibility
Heated wind vane
Transmission heater
Noise damping foam installed

Safety Features

Induction generator anti-islanding
Fail safe hydraulic disk brake
Blade over speed centrifugally actuated tip brakes
Thermal protectin on generator
Thermal protection for yaw controls
Vibration sensor for fault shutdown

Turbine M-100
  3 Phase
Power Output kWh  
40% Production 455,520
30% Production 341,640
   
Income 40% Production  
$.04 per kWh $18,220
.05 22,776
.06 27,331
.07 31,886
.08 36,441
.09 40,997
.10 45,552
Income 30% Production  
$.04 per kWh $13,665
.05 17,062
.06 20,498
.07 23,914
.08 27,331
.09 30,747
.10 34,164
Income Production Tax Credits $0.021  
40% Production 9,566
30% Production 7,175
Prices subject to change based on turbine availability  

 

100kW wind turbine

 

Power curve 100kW wind turbine

 

» All New, State-of the-art Power Electronics

» Tubular Monopole Tower

» Interior Ladder Access

 

Refurbishment Information

Refurbishment process includes inspection and replacement of all parts necessary.
Generator is re-wound and bearings are replaced (Auxilary cooling fan installed)
Gearbox has all seals and bearings replaced with new oil. Gears and shafts thoroughly inspected and replaced if needed
The hydraulic brake units are rebuilt and tested, switches are replaced also includes new brake pads.
Yaw motor is replaced, bearing and seals replaced. Yaw gear is replaced.
Slew ring is remanucatured or replaced.
The main shaft bearings and seals are checked and replaced if necessary.
The main shaft is ultra sound tested and checked for run out, and replaced if standard not met.
Wiring and Old electronics are replaced
The blades are inspected, repaired/remanucatured, balanced and matched as a set.
The blade tips are remanufactured springs tested and alll bearing and cams replaced
Tower is degreased, safety stops installed and painted.
Nacelle is degreased and painted and additional air inlets installed.